Great Energy diesel fitters recently completed a mid-life rebuild and rear engine main seal repair for one of our valued customers. This was one of three Cummins K50 – 1250kVA generators receiving scheduled mid-life engine repairs. This work was completed in situ at a remote location with a maximum allowed turnaround time of 7 days per generator, from shut down to recommissioned.

Projects
Mid-life Engine Rebuilds
1 min readBy Great Energy
Share
More from Great Energy

Projects · 18 October 2023
Restoring Generator to its Optimal Performance
Great Energy stepped in with specialized expertise to assist with a 2000kVA HV generator. Our task was to install and program a new Caterpillar AVR and recommission the Heinzmann Si-TEC control system after a recent breakdown.
Read · 1 min →
Projects · 17 October 2023
Generator Controller Upgrade
Great Energy is proud to share our recent collaboration with Townsville Water Police aboard QPV Brett Irwin! We had the honour of assisting in vital repairs by upgrading their older Deep Sea Electronics generator controller with a new model.
Read · 1 min →
Projects · 18 May 2023
Hospital Generator Replacement
The Great Energy team recently replaced an old emergency standby generator set with this new CAT C13 powered 400kva generator set. The install included a standalone fuel supply tank with stainless lines and valves.
Read · 1 min →Talk to us about your generator
Sales, hire, servicing and projects across Cairns, Far North Queensland and beyond.